Year
2018
Installer
- Ravenworth
Technology
- Technal
Deliverables
- C.U.in
The Forge
Challenge: Triple glazed U-values were specified by the architect, however the maximum unit thickness into the chosen SAPA system was 36mm.
Solution: C.U.IN achieved the specified U value whilst also being narrow enough to be compatible with the SAPA system, achieving a unique solution not procurable elsewhere.
Project summary:
The Forge project in Newham faced the challenge of needing triple-glazed U-values as specified by the architect, while the chosen SAPA system could only accommodate a maximum unit thickness of 36mm. The solution was to use C.U.IN glazing, which achieved the specified U-value while being narrow enough to fit the SAPA system, providing a unique solution not available elsewhere.